Production Scheduling
por
affaan-m
·
affaan-m
· v1.0.0 · atualizado em 2026-04-10
84
Score
>
production-scheduling
manufacturing
erp
mes
finite-capacity-scheduling
bottleneck-management
changeover-optimization
0
Stars
0
Forks
0
Usos
Cursor
Claude Code
Claude Desktop
Codex
Copilot
Windsurf
Zed
Fork
Documento do Skill
📋 Workflow
✅ Best Practices
🎯 Triggers & Fases
SKILL.md
production-scheduling/workflow
1
Identify Constraint:
— Determine the bottleneck using OEE data and capacity utilization.
2
Prioritize Demand:
— Classify jobs by priority (past-due, constraint-feeding, remaining).
3
Sequence Jobs:
— Apply dispatching rules (EDD, SPT, setup-aware EDD).
4
Optimize Changeovers:
— Use setup matrix and nearest-neighbor heuristic.
5
Stabilize Schedule:
— Lock a stabilization window (24-48 hours).
6
Re-plan Disruptions:
— Re-sequence unlocked jobs and publish to MES.
Telemetria de Agentes
Execuções
0
total
Taxa de Sucesso
0%
últimos 30d
Latência Média
0.0s
p50
Alucinação
0.0%
detecção
Tokens Entrada
0
avg 0/exec
Tokens Saída
0
avg 0/exec
Uso por Plataforma
Skills Relacionados
Similar a
Excel Automation Skill
60%
Hebbian Synapse
Composite
0.600
w = 0.3·α + 0.5·β + 0.2·γ
79
Similar a
n8n Workflow Patterns
60%
Hebbian Synapse
Composite
0.600
w = 0.3·α + 0.5·β + 0.2·γ
80
Similar a
企业微信待办事项编辑技能
60%
Hebbian Synapse
Composite
0.600
w = 0.3·α + 0.5·β + 0.2·γ
80
Árvore do Skill
Production Scheduling
production-scheduling
Fases Cognitivas
7
1.
SENSE
2.
CONTEXTUALIZE
3.
HYPOTHESIZE
4.
EVALUATE
5.
RECOMMEND
6.
ACT
7.
REFLECT
Triggers
7
optimize production schedule
respond to a machine breakdown
manage material shortages
insert a rush order into the schedule
identify and manage production bottlenecks
optimize changeover sequences
re-sequence production jobs after a disruption
Avaliar este Skill
Score Breakdown
⭐
Avaliação Humana
0%
🤖
Sucesso de Agentes
0%
🕐
Atualidade
100%
🔗
Saúde de Dependências
100%
🕸️
Centralidade no Grafo
0%
🛡️
Segurança
50%
CompositeScore = α·Humano + β·Agente + γ·Recência + δ·Deps + ε·Centralidade + ζ·Segurança
Instalação
$
synaptic mcp download production-scheduling
$
synaptic skills detail production-scheduling
$
synaptic skills live production-scheduling
Dependências
MES
CMMS
Links
GitHub Repository